NoviOcean proposes a co-location solution for the N-12.2 Offshore Wind Farm, Germany. doubling energy output per square kilometer while leveraging existing infrastructure for significant cost savings.

 

Output Power per square kilometer : 15 megawatt.
(1 megawatt rated by 15 units per square kilometer).

1.5 times more than only Wind Power.

2.5 times in combination of Wind and NoviOcean.

Capacity Factor at 34% : 44,700 MWh/year
(45% Wave, 25% Wind, 11% Solar).

Expected average output: 5.2 MW/km2.

More than double the output using the same area.

NoviOcean Co-location Map

NoviOcean

Advantages

Wave Energy

Our Journey

Future Goals

Investor Portal

1 MW Hybrid Solution
650 kW Wave, 300 kW Wind, 50 kW Solar.
(40% capacity Factor | 3.5 GWh /unit/year)

Lighter, low LCOE, more powerful – the future of clean, efficient energy

Wave energy: 5x denser than wind, 10x solar, available 24/7, highly predictable.

Since 2016, pioneering simplicity, efficiency, and sustainability in cleantech

By 2030, 0.5 GW contracted, and by 2050, 10 GW, reflecting our ambition to campture 25% of the EU’s 2050 target, worth  E 30 billion in Europe alone. The global market is six times larger  