The wave floats
Buoyancy captures wave energy through independent floats, transferring their movement to the hydraulic system.
Technology
Medi Wave 850H is NoviOcean’s current product: wave, wind and solar on a single floating structure, built largely from technologies that already work at sea.
The current product
Medi Wave 850H is NoviOcean’s current product, its pilot platform and its commercialization pathway. One floating structure carries a wave power take-off, vertical-axis wind turbines and a solar deck, and delivers their combined output through one mooring and one export cable.
The next major phase is the full-scale Medi Wave pilot with a utility partner, 2027–2028, TRL 7–8. projected
The future of Offshore Energy will NOT be single-source systems, it will be hybrid!
Wave, wind and solar come together on one floating platform.
For illustration only — the actual design is shared in closer dialogues.
How wave energy conversion works
Hydropower has run water under pressure through turbines for more than two hundred years. Those hydraulics are among the most reliable machines in energy, and NoviOcean uses them as they are.
The only innovation is where the pressure comes from. Instead of a dam and a head of water, large floats ride the passing waves and lift against the sea. The rest of the chain is equipment the industry has trusted for generations.
The mechanism
No gearbox or generator underwater. Medi Wave uses independent side floats to convert wave motion into hydraulic pressure, driving a turbine based on proven hydropower technology.
Earlier Alta Wave single-float concept, illustrating the hydraulic operating principle. Medi Wave applies the same principle with multiple independent side floats.
Independent side floats respond to passing waves.
Their movement drives hydraulic cylinders.
Pressurised water powers a Pelton turbine and generator.
The shared hydraulic principle has been tested in earlier NoviOcean prototypes. This is distinct from certification of the complete Medi Wave system.
The moving parts
A hydropower plant taken to sea and inverted. The slow travel of a wave becomes high generator speed through parts that shipyards, hydraulics suppliers and hydropower stations already build in series.
Buoyancy captures wave energy through independent floats, transferring their movement to the hydraulic system.
Standard hydraulics, the same component class used across heavy industry, converting the float’s slow travel into water at working pressure.
A turbine design in continuous hydropower service for well over a century. Nothing about it had to be invented for the sea.
The float and hydraulic unit show NoviOcean’s earlier Alta Wave test hardware. Medi Wave applies the same hydraulic principles using multiple independent floats. The Pelton runner is representative of the turbine class rather than a NoviOcean part.
Survivability
Medi Wave is designed for low to moderate offshore conditions in normal operation and engineered for survivability in extreme conditions. It builds on principles investigated and tested through NoviOcean’s earlier prototypes.
Key advantages
A single source has to be sized for its own worst hours. Three off-phased sources on one structure do not. The four figures below are the arguments that matter most to a system buyer: stability, total system cost, energy per tonne of steel, and energy per square kilometre of sea.
Measured production profiles from Galway Bay, Ireland, over the first fifteen days of April. Wind alone rarely holds above a tenth of its rated capacity. Waves hold a third. Run together, the floor rises to between forty and fifty per cent — the same physical cycle, half a day apart.
Galway Bay, Ireland, 1–15 April. Source: Seabased. Curves are redrawn for the web from the published production profiles; the baseload levels — 10%, 30% and 40–50% — are the reported values.
Result: More stable power production, reducing reliance on energy storage and fossil-fuel backup while improving opportunities to capture higher electricity prices.
Levelized Cost of Energy (LCOE) is a widely used measure of generation cost, but it does not capture the full cost of delivering dependable electricity. Levelized Full System Cost of Energy (LFSCOE) also considers storage, backup and additional generation capacity needed to meet demand reliably.
| System | Generation CAPEX / MW | Standalone LCOE | Storage & backup need | Installed capacity for a reliable 10 MW load | Total system CAPEX | Reliable 24/7 economics |
|---|---|---|---|---|---|---|
| Solar only | Low | Very low | Very high | Very high | Very high | Weak |
| Wind only | Moderate | Low | High | High | High | Moderate |
| Wind + solar | Low–moderate | Low | Moderate | Moderate–high | Moderate–high | Moderate |
| NoviOcean hybrid | Moderate | Competitive | Low–moderate | Moderate | Moderate | Strong |
Qualitative system comparison from NoviOcean’s own system modelling. Ratings are relative, not absolute, and depend on site, load profile and local energy prices.
NoviOcean’s complementary wave, wind and solar production is designed to reduce these additional system costs, improving the economics of reliable 24/7 electricity supply.
Combining wave, wind and solar on one offshore platform increases energy production from shared infrastructure. Conventional standalone systems require separate structures, moorings, cables, installation and maintenance operations, increasing the infrastructure required to deliver the same energy output.
The result: lower structural and installation requirements, fewer duplicated offshore operations and more energy from shared infrastructure — reducing the full-system cost of electricity.
Vertical-axis turbines sit below the rotor layer of a conventional offshore wind farm. Published research finds that they speed up wake recovery for the large machines above them while harvesting the lower wind layer themselves — two effects that raise the energy yield of the same lease area.
Faster wake recovery for large horizontal-axis turbines, enabled by co-located vertical-axis turbines.
Increased output from individual vertical-axis turbines benefiting from turbulent flow within horizontal-axis wind farms, compared with standalone operation.
Higher power density per square kilometre through co-location, tighter turbine spacing and vertically layered turbine arrays.
NoviOcean’s hybrid platforms are designed to add approximately 15 MW of installed wave, wind and solar capacity per square kilometre of offshore wind-farm area, with a projected capacity factor comparable to offshore wind. NoviOcean design target
Sources: Xie et al. (2017) · Hansen et al. (2020) · Dabiri (2011) · Shao et al. (2023) · Chen & Agarwal (2012). Published co-location findings are indicative and study- and site-dependent, not guaranteed performance gains. The value for a specific site depends on layout, wind climate and turbine selection.
Technology ecosystem
NoviOcean is a systems integrator. Solar, wind and the marine structure come from established suppliers and established methods; the wave power take-off is NoviOcean’s own. Roughly 65% of rated capacity comes from established specialist technologies. management estimate
Midsummer
Commercially established technology. Lightweight flexible CIGS panels, low shading sensitivity, good low-light performance and a marine-suitable design, laid onto a deck the platform needs anyway.
approximately TRL 9Wind Harvest
Substantial full-scale development. Compact vertical-axis turbines that benefit from close placement and run quietly, mounted on the platform rather than on a tower of their own.
~TRL 7 completed → TRL 8 / certificationShipyard construction
Conventional welded-steel shipyard engineering and established marine construction methods, enabling fabrication of the structure at suitable local shipyards.
established methodsNoviOcean
Presently TRL 6 and progressing toward TRL 7. Based primarily on established hydropower and industrial components and principles used for more than a century.
TRL 6 → 7Rated capacity is the installed nameplate; annual production is modelled and site-dependent. Marine integration and final configuration still require engineering and validation.
Marine integration and final configuration still require engineering and validation.
Turbine number, turbine rating and photovoltaic area remain project-dependent — typically five to seven modular 50–75 kW vertical-axis turbines and approximately 1,000–1,300 m² of solar deck. management estimate
Technology-readiness levels on this page are screening self-assessments made by NoviOcean and its partners. They are not independent certifications.
The three layers
Waves keep rolling after the wind fades. The sun fills the calm days. Put all three on one floating structure and the output steadies — while the costly parts get shared.
Floats ride the swell and drive hydraulic cylinders, producing pressurised water that powers a Pelton turbine and generator. Proven hydropower principles minimise metal-to-metal wear. The power takeoff has a 50-year design-life basis; the main steel structure also targets 50 years.
NoviOcean · TRL 6 → 7Vertical-axis turbines from Wind Harvest sit low on the deck. They capture slightly less energy than tall horizontal turbines, but create dramatically smaller overturning moments — less steel, a lighter platform, simpler installation. Wind Harvest has completed substantial full-scale development and is progressing toward certification.
~TRL 7 completed → TRL 8Flexible CIGS panels from Midsummer cover the deck surface that already has to exist. Lightweight, saltwater-ready, and adding generation on space the structure provides for free.
Midsummer · approximately TRL 9
Future development
Alta Wave is a future specialized solution for very high-energy wave regions. NoviOcean’s current product, pilot and commercialization pathway is Medi Wave 850H.
Alta Wave shares the same validated principles: buoyancy-driven hydraulics, a Pelton turbine, vertical-axis wind and a solar deck on one floating structure. Its development history — tank testing, offshore operation and third-party simulation — is part of the evidence base behind the platform as a whole. It is not a parallel near-term programme and does not draw on current commercialization resources.
The development journey, offshore testing, the NO3 demonstrator and the simulation work sit on the Validation page. If it is easier to ask directly, a short introductory meeting is the fastest route.