Applications

One platform. Many coastlines.

The same floating structure, sited for very different jobs at sea — from replacing island diesel to making freshwater.

Priority early applications

Start with the problem, not the platform.

NoviOcean has approximately twelve credible applications management estimate. All remain discoverable, because a visitor may not initially realize that the same offshore platform can support their particular need. Four of them lead today, and each has its own page — the customer problem, what NoviOcean brings to it, and a possible route to a first project.

The yearly effect

What a single unit displaces.

Where a unit replaces diesel generation, this is the pair of numbers customers ask about first.

1,000,000 litres

Diesel eliminated, per unit, per year

Fuel that no longer has to be bought, shipped and stored at the site.

modeled

~2,500 tonnes

CO₂e avoided annually, per unit

Emissions avoided by the diesel generation the unit replaces.

modeled

Expressed as output rather than avoidance, the same unit corresponds to approximately 2,500 MWh of electricity per year — or, where a site needs water more than power, desalination of 70,000–100,000 litres per hour. modeled

All of these figures describe one unit in a diesel-displacing application. Actual savings depend on the site, the load profile and the plant being replaced.

The wider opportunity set

Priorities can move. The platform does not have to.

Priority applications may change with project traction, energy prices and policy support. Grid markets in the UK, Taiwan or elsewhere can become early opportunities where support mechanisms provide stronger remuneration.

Eight further applications are documented on their own page. They are listed here by name so that a visitor arriving with one of these needs can recognise it immediately.

An array of NoviOcean hybrid wave, wind and solar platforms deployed off a coastline, with service vessels alongside

One array. One cable to shore.

For illustration only — the actual design is shared in closer dialogues.

Which coastline is yours?

Tell us the site, the load and what it costs to power today. We will tell you honestly whether a NoviOcean unit is a sensible fit for it.